Contact Us
Blockchain Quantum Readiness Index

Blockchain Quantum Readiness Index

Which chains survive a quantum computer?

How well do blockchains hold up against a quantum computer big enough to break today's elliptic-curve cryptography (ECC)? Each chain gets a stage. It moves up only when every check passes, and every rating cites public evidence. The scorer is open, so anyone can reproduce the results.

Get your chain assessed How we rate chains

17chains scored
3/17let users hold funds under a PQ key (Stage 4+)
0/17protect users (Stage 5+)
Stage 4highest stage reached
20median score / 100

Chains

ChainStageScore Rosette slicesMarket cap
Bitcoin
L1 · UTXO
Stage 0Not started
13.8
UCPBAM$1.5T
Ethereum
L1 · EVM
Stage 3Testnet
40
UCPBAM$259B
XRP Ledger
L1 · XRPL
Stage 1Committed
16
UCPBAM$68.7B
Solana
L1 · Solana
Stage 3Testnet
33.3
UCPBAM$50.9B
Stellar
L1 · Stellar
Stage 3Testnet
36.7
UCPBAM$5.16B
NEAR
L1 · NEAR
Stage 4Live option
40.7
UCPBAM$4.6B
Avalanche C-Chain
L1 · EVM
Stage 0Not started
8
UCPBAM$3.58B
Sui
L1 · Move
Stage 2Code merged
20
UCPBAM$3.41B
Hedera
L1 · Hedera
Stage 1Committed
16
UCPBAM$2.98B
Polkadot
L1 · Substrate
Stage 0Not started
8
UCPBAM$1.47B
Arbitrum One
L2 · EVM
Stage 3Testnet
16.5
UCPBAM$1.22B
Algorand
L1 · Algorand
Stage 4Live option
40
UCPBAM$839M
Cosmos Hub
L1 · Cosmos SDK
Stage 2Code merged
26
UCPBAM$721M
Aptos
L1 · Move
Stage 2Code merged
17.3
UCPBAM$509M
Starknet
L2 · Cairo
Stage 4Live option
22
UCPBAM$299M
Tezos
L1 · Tezos
Stage 3Testnet
40
UCPBAM$278M
OP Mainnet
L2 · EVM
Stage 1Committed
12
UCPBAM$227M
Exposed (0 pts)Unknown (scored as exposed)Discussed / plannedIn development / testnetLive (hybrid or PQ)Not applicable

Slices: U user keys · C consensus · P proof system · B bridges · A admin keys · M migration. Wedge length = slice points (0–10). Sorted by market cap, not readiness. Chains under $100M market cap are not listed. Market cap: CoinGecko /simple/price (native or governance token market cap, USD), snapshot 2026-11-09. L2 governance tokens (ARB, OP, STRK) understate the value these chains secure. Unknown slices score zero; each chain page shows how much of its rating is researched and in scope.

Stages

Stages 0–4 track how far post-quantum user accounts have got. From Stage 5, users are actually protected: every requirement must pass, including an audit and an approved NIST standard.

Getting ready: Stages 0–4

Stage 0Not started

Post-quantum user accounts have only been discussed, or not at all.

Stage 1Committed

An official roadmap or accepted spec covers post-quantum user accounts.

Stage 2Code merged

Post-quantum user accounts are merged into the core code, but not yet on a public network (devnet at most).

Stage 3Testnet

Post-quantum user accounts run on a public testnet, or on mainnet without keeping funds at rest out of reach of ECC keys.

Stage 4Live option

Users can hold funds on mainnet under a post-quantum key that no ECC key can override. Not yet audited, standard or backed by post-quantum consensus.

Protection begins: Stages 5–7

Stage 5Escape hatch

Users can keep funds where no ECC key can touch them and spend with an approved PQ mechanism on mainnet. The PQ code has a current audit, and PQ consensus is at least in development. L2s also need sound proofs and safe upgrade keys.

Stage 6Hybrid protected

Consensus, bridges and admin keys are PQ or hybrid, or admin keys sit behind a long timelock with a PQ override. There is a dated migration plan and new accounts are PQ by default, unless ECC is already sunset. L2s also need live PQ proofs.

Stage 7Quantum-safe

Existing accounts and contracts can migrate (or the chain never used ECC), and ECC is switched off: no ECC-only path can move material value.

Is your chain or protocol quantum-ready?

Get it assessed. We rate it with the same open method, show what is exposed, and map the steps to the next stage. LimeChain's engineers can then help you build them.

Get your chain assessed

Open, repeatable scoring. Non-zero ratings need public evidence; missing evidence means unknown. Methodology v0.4 · mechanism registry 2026-10-13.